# voestalpine to build EUR 350M special steel plant in Kapfenberg, Austria

voestalpine AG will build a new special steel plant in Kapfenberg, Austria, with an investment of EUR 330-350 million. The plant will replace the existing Böhler special steel plant and is scheduled to commence operations in 2021.

- Type: New facility
- Announced: 2017-09-27
- Where: Kapfenberg, Austria, Austria
- Value: $413.0M (350.0M EUR)
- Starts operating: 2021
- Status: announced
- Products: high-performance special steels
- Sectors: [Steel and Metal Products](https://endata.com/sectors/steel-metal-products.md)

## Companies

- [voestalpine](https://endata.com/companies/19723.md)

## Sources

- [voestalpine.com](https://www.voestalpine.com/group/en/media/press-releases/2017-09-27-voestalpine-invests-up-to-eur-350-million-in-the-worlds-most-advanced-special-steel-plant-in-kapfenberg/), 2017-09-27: "the most advanced special steel plant in the world, representing an investment of EUR 330 to 350 million and designed to supply the most demanding customer segments, will be erected in Kapfenberg, Austria"

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
