# Robbins supplies TBM for Bheri Babai Diversion Multipurpose Project in Nepal

Robbins supplied a 5.06-meter diameter Double Shield TBM for Nepal's first TBM project, the Bheri Babai Diversion Multipurpose Project, after factory acceptance testing in July 2017.

- Type: Contract
- Announced: 2017-07-01
- Where: Siwalik Range, Bheri Babai Diversion Multipurpose Project, Nepal
- Status: announced
- Products: tunnel boring machine
- Sectors: [Mining Equipment](https://endata.com/sectors/mining-equipment.md)

## Companies

- [The Robbins Company](https://endata.com/companies/24541.md)
- [China Overseas Engineering Group](https://endata.com/companies/26344.md) (customer)
- [China Railway No.2 Engineering Co.](https://endata.com/companies/26345.md) (customer)

## Sources

- [nastt.org](https://nastt.org/2017/08/17/robbins-double-shield-nepals-tbm-bheri-babai/), 2017-08-17: "The design of Robbins TBMs is good, and in particular Double Shield TBMs."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
