# Siemens-led consortium wins tender for 1,000 MW wind turbine project in Turkey

A consortium led by Siemens has won a tender to build Turkey's first wind turbines with a total capacity of 1,000 MW, as part of the YEKA renewable energy project. The consortium has 21 months to complete the installation.

- Type: Contract
- Announced: 2017-08-03
- Where: Turkey, Türkiye
- Value: $1.00B
- Status: announced
- Capacity: 1,000 MW
- Products: wind turbines
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Siemens](https://endata.com/companies/301.md)
- [Kalyon](https://endata.com/companies/26071.md) (partner)
- [Turkerler](https://endata.com/companies/26072.md) (partner)

## Sources

- [f.aa.com.tr](https://f.aa.com.tr/sq/ekonomi/turqi-siemens-do-t%C3%AB-nd%C3%ABrtoj%C3%AB-turbinat-e-para-me-er%C3%AB/875715), 2017-08-03: "Konsorciumi i kryesuar nga Siemens, si ofruesi më i përshtatshëm në tender, ka fituar punën për ndërtimin e turbinave të parë me erë në Turqi me kapacitet prej një mijë megavatësh."
- [it.eureporter.co](https://it.eureporter.co/frontpage/2017/08/04/germanys-siemens-wins-tender-for-turkish-wind-power-project/), 2017-08-04: "La Turchia ha scelto la tedesca Siemens come acquirente vincente per un progetto di energia eolica di $ 1 miliardi"

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
