# AEG Power Solutions wins UPS contract for Orpic petrochemical complex

AEG Power Solutions was selected by Tecnimont to provide AC and DC UPS systems for Orpic's Liwa Plastic Industries Complex in Oman, including polyethylene and polypropylene plants. The project is expected to be completed by the end of 2019.

- Type: Contract
- Announced: 2017-07-07
- Where: Liwa Plastic Industries Complex, Oman, Oman
- Status: announced
- Capacity: 880,000 tpy polyethylene, 300,000 tpy polypropylene
- Products: UPS systems, polyethylene, polypropylene
- Sectors: [Specialty Chemicals](https://endata.com/sectors/specialty-chemicals.md), [Plastics and Polymers](https://endata.com/sectors/plastics-polymers.md), [Electrical Equipment](https://endata.com/sectors/electrical-equipment.md)

## Companies

- [Tecnimont](https://endata.com/companies/2684.md) (customer)
- [Oman Oil Refineries and Petroleum Industries Company](https://endata.com/companies/23392.md) (customer)
- [AEG Power Solutions](https://endata.com/companies/25438.md) (supplier)

## Sources

- [hydrocarbonengineering.com](https://www.hydrocarbonengineering.com/petrochemicals/07072017/aeg-power-solutions-wins-contract-for-petrochemical-plants/), 2017-07-07: "AEG Power Solutions has been selected to provide AC and DC UPS to secure the power supply for a polyethylene plant and a polypropylene plant owned by Orpic."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
