# DONG Energy signs 752 MW turbine supply deal with Siemens Gamesa for Borssele 1 & 2

DONG Energy signed a contract with Siemens Gamesa for 94 of its 8 MW wind turbines for the Borssele 1 and 2 offshore wind farm in the Netherlands. The project is expected to be fully operational by end of 2020.

- Type: Contract
- Announced: 2017-07-06
- Where: Borssele, off the coast of Zeeland, Netherlands
- Status: announced
- Capacity: 752 MW (94 turbines of 8 MW each)
- Products: offshore wind turbines
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Siemens Gamesa](https://endata.com/companies/1539.md) (supplier)
- [DONG Energy](https://endata.com/companies/1719.md) (customer)

## Sources

- [cleantechnica.com](https://cleantechnica.com/2017/07/06/dong-energy-sign-752-mw-wind-turbine-supply-agreement-siemens-gamesa-borssele-1-2/), 2017-07-06: "DONG Energy has announced that it has signed a contract with wind turbine manufacturer Siemens Gamesa for the supply of 752 megawatts worth of wind turbines for the Borssele 1 and 2 offshore wind farm."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
