# Emefcy prepares first production line for China factory in Changzhou

Emefcy completed acceptance testing on its high-speed MABR production line in Israel, which will be shipped to its new factory in Changzhou, China, with operation expected by end of Q3 2017.

- Type: New facility
- Announced: 2017-06-21
- Where: Changzhou, China, China
- Starts operating: Q3 2017
- Status: under construction
- Capacity: 7,500 MABR modules annually
- Products: Membrane Aerated Biofilm Reactors (MABR) modules
- Sectors: [Water Treatment Equipment](https://endata.com/sectors/water-treatment-equipment.md)

## Companies

- [Emefcy Group](https://endata.com/companies/1355.md)

## Sources

- [abnnewswire.net](https://abnnewswire.net/press/en/88820/Emefcy-Group-Ltd-(ASX-EMC)-Prepares-First-Production-Line-for-China.html), 2017-06-20: "Successful testing in Israel of the Changzhou production line marks an important milestone for us, because this first manufacturing facility in China is anticipated to enable us to supply cost-optimized MABR products."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
