# Wärtsilä to supply power plant extension to AngloGold Ashanti gold mine in Guinea

Wärtsilä will supply a power plant extension to AngloGold Ashanti's Siguiri gold mine in Guinea, consisting of three Wärtsilä 32TS engines. The extension is expected to be operational in the second half of 2018, adding 30.4 MW of power.

- Type: Contract
- Announced: 2017-06-14
- Where: Siguiri, Guinea
- Status: announced
- Capacity: 30.4 MW
- Products: power plant engines
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md), [Mining Equipment](https://endata.com/sectors/mining-equipment.md)

## Companies

- [Wärtsilä](https://endata.com/companies/254.md) (supplier)
- [AngloGold Ashanti](https://endata.com/companies/24899.md) (customer)

## Sources

- [wartsila.com](https://www.wartsila.com/media/news/14-06-2017-wartsila-to-supply-gold-mine-extension-to-guinea), 2017-06-14: "Wärtsilä today announced it would supply a power plant extension to AngloGold Ashanti’s gold mine in Siguiri, Guinea."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
