# CEMEX UK takes delivery of world's first electric Terex Fuchs material handler at Dagenham Wharf

CEMEX UK has taken delivery of the world's first electrically powered Terex Fuchs SHL885 material handler for ship unloading at Dagenham Wharf on the River Thames. The total investment was £1.5 million.

- Type: Investment
- Announced: 2017-06-05
- Where: Dagenham Wharf, River Thames, UK, United Kingdom
- Value: $1.90M (1.50M GBP)
- Starts operating: 5 Jun 2017
- Status: completed
- Capacity: 250,000 tonnes per year
- Products: electric material handler, limestone handling
- Sectors: [Material Handling](https://endata.com/sectors/material-handling.md), [Mining Equipment](https://endata.com/sectors/mining-equipment.md)

## Companies

- [CEMEX UK](https://endata.com/companies/24702.md)
- [Blue Fuchs](https://endata.com/companies/24703.md) (supplier)
- [Terex Fuchs](https://endata.com/companies/24704.md) (partner)

## Sources

- [agg-net.com](https://www.agg-net.com/news/material-handling-world-first-for-cemex-uk), 2017-06-05: "CEMEX UK have recently taken delivery of the world’s first electrically powered Terex Fuchs SHL885 material handler."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
