# Kaiser Aluminum ramps up $150M investment at Trentwood plant

Kaiser Aluminum is spending more aggressively on its $150 million investment at the Trentwood plant in Spokane Valley, including installing a three-story plate shear, to increase manufacturing capacity by 5-10% by early 2018.

- Type: Investment
- Announced: 2017-05-11
- Where: Spokane Valley, Washington, United States
- Value: $150.0M
- Starts operating: 2018
- Status: under construction
- Capacity: 5-10% increase in manufacturing capacity
- Products: aluminum plate, sheet, coil products
- Sectors: [Steel and Metal Products](https://endata.com/sectors/steel-metal-products.md)

## Companies

- [Kaiser Aluminum](https://endata.com/companies/7296.md)

## Sources

- [spokanejournal.com](https://www.spokanejournal.com/articles/3982-kaiser-ramps-up-plant-investment-at-trentwood), 2017-05-11: "We’re bringing a lot of the modernization online this year."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
