# Nu-Tech begins shipment of pressure tubes for Darlington refurbishment

Nu-Tech Precision Metals completed and began shipping pressure tubes for Ontario Power Generation's Darlington reactor refurbishment, under a subcontract from the SNC-Lavalin/Aecon Joint Venture. Manufacturing finished eight weeks ahead of schedule.

- Type: Contract
- Announced: 2017-05-04
- Where: Arnprior, Ontario, Canada
- Status: completed
- Capacity: 480 pressure tubes
- Products: pressure tubes for nuclear reactors
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Nu-Tech Precision Metals](https://endata.com/companies/24061.md)
- [SNC-Lavalin](https://endata.com/companies/296.md) (customer)
- [Aecon Group](https://endata.com/companies/3614.md) (customer)
- [Ontario Power Generation](https://endata.com/companies/8140.md) (customer)

## Sources

- [newswire.ca](https://www.newswire.ca/news-releases/nu-tech-begins-shipment-of-pressure-tubes-for-darlington-retube--feeder-replacement-project-one-of-canadas-largest-green-energy-projects-621319403.html), 2017-05-04: "Since 1957, every pressure tube in an operating CANDU reactor has been made by Nu-Tech."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
