# Woojin signs $3.83M cable supply contract with KHNP for Shin-Kori 5&6

Woojin signed a 3.83 billion won contract with Korea Hydro & Nuclear Power (KHNP) to supply assembly cables for the Shin-Kori 5 and 6 nuclear reactors. The contract runs until May 31, 2021.

- Type: Contract
- Announced: 2017-05-02
- Where: South Korea
- Value: $3.38M (3.83B KRW)
- Status: announced
- Products: assembly cables
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Woojin](https://endata.com/companies/23990.md)
- [Korea Hydro & Nuclear Power](https://endata.com/companies/2868.md) (customer)

## Sources

- [biz.heraldcorp.com](https://biz.heraldcorp.com/article/1315636), 2017-05-02: "우진은 한국수력원자력과 신고리 5ㆍ6호기 조립케이블 공급계약을 체결했다고 2일 공시했다."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
