# Amec Foster Wheeler wins $48.4M contract for Idaho water treatment plant upgrade

Amec Foster Wheeler has been awarded a $48.4 million design-build contract by the U.S. Army Corps of Engineers to upgrade the water treatment plant at the Bunker Hill Superfund site near Kellogg, Idaho.

- Type: Contract
- Announced: 2017-04-07
- Where: Kellogg, Idaho, United States
- Value: $48.4M
- Status: announced
- Products: water treatment plant upgrade, slurry wall, groundwater collection system
- Sectors: [Water Treatment Equipment](https://endata.com/sectors/water-treatment-equipment.md)

## Companies

- [Amec Foster Wheeler](https://endata.com/companies/1093.md)
- [U.S. Army Corps of Engineers](https://endata.com/companies/8521.md) (customer)
- [US Environmental Protection Agency](https://endata.com/companies/23460.md) (customer)

## Sources

- [watertechonline.com](https://www.watertechonline.com/wastewater/article/16224042/usace-awards-amec-foster-wheeler-484m-design-build-contract-for-upgrades-to-idaho-water-treatment-plant), 2017-04-07: "Using our experience and expertise in remediation works, we are best placed to help our clients address their environmental liabilities."
- [filtsep.com](https://www.filtsep.com/content/news/amec-foster-wheeler-s-us-water-treatment-plant-upgrade-includes-pressure-filter-system), 2017-04-07: "Under the US$48.4 million contract, Amec Foster Wheeler will design and construct an expansion of the currently operating Central Treatment Plant, including new reactors, a sludge thickener and pressure filter system."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
