# Schneider Electric opens new LV and MV panel plant in Cikarang, Indonesia

Schneider Electric announced the opening of a new engineer-to-order plant for low voltage and medium voltage panels in Cikarang, Indonesia. The plant is the largest in Asia, producing 30,000 panels per year, and employs over 1,000 local workers.

- Type: New facility
- Announced: 2017-03-01
- Where: East Jakarta Industrial Park, Cikarang, Indonesia, Indonesia
- Jobs: 1,000
- Starts operating: 1 Mar 2017
- Status: completed
- Capacity: 30,000 panels per year
- Products: low voltage panels, medium voltage panels
- Sectors: [Electrical Equipment](https://endata.com/sectors/electrical-equipment.md)

## Companies

- [Schneider Electric](https://endata.com/companies/2048.md)

## Sources

- [swa.co.id](https://swa.co.id/read/162121/schneider-bangun-pabrik-baru-di-cikarang), 2017-03-02: "Schneider Electric mengumumankan pembangunan pabrik baru di Kawasan East Jakarta Industrial Park, Cikarang (1/3/2017)."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
