# IFA Powertrain completes plant construction in Ujazd, Poland

IFA Powertrain completed construction of a 34,000 sqm production hall in Ujazd, Poland, and is equipping it with 400 machines. The German automotive supplier will invest over 100 million euros and is hiring workers. The plant will produce drive shafts, joints, and other components.

- Type: Expansion
- Announced: 2017-03-02
- Where: Ujazd, Opole Voivodeship, Poland
- Value: $106.0M (100.0M EUR)
- Status: under construction
- Products: drive shafts, joints, automotive components
- Sectors: [Automotive Components](https://endata.com/sectors/automotive-components.md)

## Companies

- [IFA Powertrain](https://endata.com/companies/22578.md)

## Sources

- [coi.opolskie.pl](https://coi.opolskie.pl/2017/03/02/ifa-powertrain-polska-w-ujezdzie-szuka-pracownikow/), 2017-03-02: "Zakończyła się budowa hali produkcyjnej firmy IFA w gminie Ujazd."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
