# Nissin Electric completes new small oil-immersed transformer factory in Maebashi

Nissin Electric completed a new dedicated factory for 77kV and below oil-immersed instrument transformers at its Maebashi Works in Gunma Prefecture, Japan. The factory started operations on January 20, 2017, with an annual production capacity of 1,400 units and an investment of 250 million yen.

- Type: New facility
- Announced: 2017-01-23
- Where: Maebashi, Gunma Prefecture, Japan, Japan
- Value: $2.20M (250.0M JPY)
- Starts operating: 20 Jan 2017
- Status: completed
- Capacity: 1,400 units per year
- Products: oil-immersed instrument transformers, power supply/demand instrument transformers
- Sectors: [Electrical Equipment](https://endata.com/sectors/electrical-equipment.md)

## Companies

- [Nissin Electric](https://endata.com/companies/21622.md)

## Sources

- [nissin.jp](https://nissin.jp/news/170123/), 2017-01-23: "日新電機株式会社は、当社前橋製作所に77kV以下油入計器用変成器の専用工場が完成し、2017年1月20日に稼働式を執り行いました。"

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
