# UBC Group building Green Cold plant in Vinnytsia, Ukraine

UBC Group is building a new industrial refrigeration equipment plant called Green Cold in Vinnytsia, Ukraine. The facility will have an area of about 20,000 square meters and is expected to create 1,200 jobs over three years. Construction began on June 10, 2016.

- Type: New facility
- Announced: 2016-11-30
- Where: Vinnytsia, Nemyrivske Shose 213, Ukraine
- Jobs: 1,200
- Status: under construction
- Capacity: 20,000 square meters
- Products: industrial refrigeration equipment
- Sectors: [HVAC and Industrial Refrigeration](https://endata.com/sectors/hvac-refrigeration.md)

## Companies

- [UBC Group](https://endata.com/companies/20273.md)

## Sources

- [vinbazar.com](https://vinbazar.com/news/ekonomika/u-vinnitsi-studentiv-zaprosili-pratsyuvati-na-novii-zavod-yakii-buduyut-u-misti-fotov), 2016-11-30: "Новий завод, будівництво, якого триває на території Вінницького інвестиційного парку, отримав назву Green Cold (Зелений холод)."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
