# Biwater awarded water treatment contract for GRIP facility in California

Biwater was awarded a contract to design, supply and supervise installation of ultrafiltration and reverse osmosis systems for the 14.8 million gallon per day GRIP advanced water treatment facility in Pico Rivera, California. The plant is expected to be completed by July 2018.

- Type: Contract
- Announced: 2016-11-16
- Where: Pico Rivera, California, United States
- Status: under construction
- Capacity: 14.8 million US gallons per day
- Products: ultrafiltration systems, reverse osmosis systems
- Sectors: [Water Treatment Equipment](https://endata.com/sectors/water-treatment-equipment.md)

## Companies

- [Biwater](https://endata.com/companies/19857.md)
- [Water Replenishment District of Southern California](https://endata.com/companies/20077.md) (customer)

## Sources

- [waterworld.com](https://www.waterworld.com/home/article/16204845/biwater-awarded-advanced-water-treatment-project-in-california), 2016-11-16: "Biwater is on track to supply state-of-the-art UF and RO systems by late 2017 for the new GRIP advanced water treatment plant."
- [waterbriefing.org](https://www.waterbriefing.org/home/contracts/item/13212-biwater-wins-advanced-water-treatment-project-contract-in-california), 2016-11-18: "Biwater is on track to supply state-of-the-art UF and RO systems by late 2017 for the new GRIP advanced water treatment plant."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
