# AGC plans solar control coating facility in Cikampek, Indonesia

AGC Asahi Glass will build a new solar-control coating facility for architectural glass at the Cikampek Factory of PT Asahimas Flat Glass Tbk in Indonesia. Capital investment is about 4.0 billion yen, with production capacity of about 6.0 million m2 per year, and start planned for Q2 2018.

- Type: New facility
- Announced: 2016-11-15
- Where: Cikampek, Indonesia, Indonesia
- Value: $36.0M (4.00B JPY)
- Starts operating: Q2 2018
- Status: announced
- Capacity: 6.0 million m2 per year
- Products: solar-control coated glass, Low-e coated glass
- Sectors: [Construction Materials](https://endata.com/sectors/construction-materials.md)

## Companies

- [AGC](https://endata.com/companies/20063.md)
- [PT Asahimas Flat Glass Tbk](https://endata.com/companies/20064.md) (partner)

## Sources

- [glassonline.com](https://www.glassonline.com/agc-plans-solar-control-coating-facility-in-indonesia/), 2016-11-15: "AGC Asahi Glass (AGC), a world-leading manufacturer of glass, chemicals and high-tech materials, announces that it will build a new solar-control coating facility for architectural glass at the Cikampek Factory of PT Asahimas Flat Glass Tbk (AMG), one of AGC’s consolidated subsidiaries in Indonesia."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
