# GE wins multi-year contract to overhaul turbines at four Chilean thermal plants

GE Power Services will overhaul steam turbines and generators at four thermal power plants in Chile under a multi-year contract with AES Gener. The first project is underway at the 264 MW Nueva Tocopilla gas-fired plant.

- Type: Contract
- Announced: 2016-11-04
- Where: Antofagasta region, Chile
- Status: announced
- Products: steam turbine and generator overhaul services
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [GE Power Services](https://endata.com/companies/885.md)
- [AES Gener](https://endata.com/companies/16290.md) (customer)

## Sources

- [powerengineeringint.com](https://www.powerengineeringint.com/coal-fired/equipment-coal-fired/ge-wins-chile-thermal-plant-deal/), 2016-11-04: "GE’s multi-year contract is with power company AES Gener, which operates a total of 4 GW of installed capacity in Chile."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
