# Edina to supply biogas CHP units for Yorkshire Water AD plant in Leeds

Edina Group won a contract from Black & Veatch to supply and install two 2MWe MWM CHP generating sets for Yorkshire Water's new £72 million anaerobic digestion facility at Knostrop, Leeds. The facility is scheduled for completion in 2019.

- Type: Contract
- Announced: 2016-11-02
- Where: Leeds, West Yorkshire, United Kingdom
- Value: $89.0M (72.0M GBP)
- Status: announced
- Capacity: 131 tonnes of dry sludge per day
- Products: biogas CHP generating sets, anaerobic digestion facility
- Sectors: [Water Treatment Equipment](https://endata.com/sectors/water-treatment-equipment.md), [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Black & Veatch](https://endata.com/companies/293.md) (customer)
- [Edina](https://endata.com/companies/4032.md) (supplier)
- [Yorkshire Water](https://endata.com/companies/15254.md) (customer)

## Sources

- [edina.eu](https://www.edina.eu/news/edina-supplies-biogas-chp-new-yorkshire-water-ad-facility), 2016-11-02: "This is the single biggest investment of our current investment period (2015-2020) and will not only provide increased treatment capacity for our sludge’s but will also deliver significant operational cost savings enabling us to keep customer bills as low as possible."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
