# Adata to build integrated circuit packaging plant in Brazil

Adata announced the opening of its first Brazilian semiconductor manufacturing plant in Santo Antônio da Posse, São Paulo. The company will invest US$80 million over three years, including two clean rooms. The plant will create 320 direct jobs and have a monthly production capacity of 5 million semiconductors, starting operations in early 2017.

- Type: New facility
- Announced: 2016-11-18
- Where: Santo Antônio da Posse, São Paulo, Brazil
- Value: $80.0M
- Jobs: 320
- Starts operating: Jan 2017
- Status: announced
- Capacity: 5 million semiconductors per month
- Products: DRAM memory modules, NAND flash memory, integrated circuits
- Sectors: [Semiconductors and Industrial Electronics](https://endata.com/sectors/semiconductors-electronics.md)

## Companies

- [Adata](https://endata.com/companies/19713.md)

## Sources

- [tiinside.com.br](https://tiinside.com.br/en/18/11/2016/adata-installs-first-integrated-circuit-encapsulation-factory-in-brazil/), 2016-11-18: "Adata, a manufacturer of high-performance DRAM memory modules and NAND flash memory, announced the opening of its first Brazilian semiconductor manufacturing plant."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
