# STP-Lipetsk opens grinding machine plant in Lipetsk

AO STP-Lipetsk Machine Tool Enterprise opened a new plant for producing grinding machines on a 4,500 sqm area, with capacity of 320 machines per year and 90 new jobs. The project cost over 507 million rubles.

- Type: New facility
- Announced: 2017-12-13
- Where: Lipetsk, Russia, Russia
- Value: $8.70M (507.0M RUB)
- Jobs: 90
- Starts operating: 13 Dec 2017
- Status: completed
- Capacity: 320 machines per year
- Products: grinding machines
- Sectors: [Industrial Machinery](https://endata.com/sectors/industrial-machinery.md)

## Companies

- [STP-Lipetsk Machine Tool Enterprise](https://endata.com/companies/18041.md)

## Sources

- [integral-russia.ru](https://integral-russia.ru/2017/12/14/stp-lipetskoe-stankostroitelnoe-predpriyatie-zapustilo-zavod-po-proizvodstvu-sovremennyh-shlifovalnyh-stankov/), 2017-12-13: "АО «СТП-Липецкое станкостроительное предприятие» запустило новый завод по производству шлифовальных станков."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
