# Toshiba starts construction on expansion of Cirebon coal-fired power plant in Indonesia

Toshiba Energy Systems & Solutions Corporation announced that construction work on the expansion of the Cirebon coal-fired thermal power plant in Indonesia has started. Toshiba will supply a 1,000MW ultra-supercritical steam turbine and generator. Commercial operation is expected in 2022.

- Type: Expansion
- Announced: 2017-11-16
- Where: Cirebon, West Java, Indonesia
- Starts operating: 2022
- Status: under construction
- Capacity: 1,000 MW
- Products: ultra-supercritical steam turbine, generator, plant control systems
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Toshiba Energy Systems & Solutions](https://endata.com/companies/4554.md)
- [Mitsubishi Hitachi Power Systems](https://endata.com/companies/1024.md) (partner)
- [Hyundai Engineering & Construction](https://endata.com/companies/17889.md) (partner)
- [PT. Cirebon Energi Prasarana](https://endata.com/companies/17890.md) (customer)

## Sources

- [asia.toshiba.com](https://asia.toshiba.com/press-release/english/toshiba-to-start-construction-of-expansion-of-cirebon-coal-fired-thermal-power-plant-in-indonesia/), 2017-11-16: "Toshiba Energy Systems & Solutions Corporation today announced that construction work on the expansion of the Cirebon coal-fired thermal power plant in Indonesia has started."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
