# Paroc to invest PLN 260M in stone wool line at Trzemeszno plant

Paroc is extending its plant in Trzemeszno, Poland, with a new production line for stone wool insulation, investing PLN 260 million. The project is expected to be completed in 2019, adding annual capacity of 60,000-70,000 tonnes.

- Type: Expansion
- Announced: 2017-10-17
- Where: Trzemeszno, Poland
- Value: $72.0M (260.0M PLN)
- Starts operating: 2019
- Status: announced
- Capacity: 60,000-70,000 tonnes per year
- Products: stone wool insulation
- Sectors: [Construction Materials](https://endata.com/sectors/construction-materials.md)

## Companies

- [Paroc](https://endata.com/companies/17863.md)

## Sources

- [budownictwob2b.pl](https://budownictwob2b.pl/przegrody/puls-branzy/23001-grupa-paroc-rozbudowuje-i-zwieksza-mozliwosci-produkcyjne-zakladu-w-trzemesznie), 2017-10-17: "To dla nas ważny krok w kierunku podtrzymania dotychczasowego, zrównoważonego rozwoju firmy"
- [eurobuildcee.com](https://eurobuildcee.com/en/news/22887-more-rock-wool-in-trzemeszno), 2017-11-13: "For us this is an important step in maintaining the company’s current development."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
