# Yokogawa subsidiary wins analyzer house order for PETRONAS RAPID project in Malaysia

Yokogawa Kontrol (Malaysia) won an EPCC order from PETRONAS to supply an analyzer house with process analyzers and sampling devices, plus tank quality and pipe tracking solutions, for the RAPID project's oil storage facilities at Pengerang. Construction is due to finish by August 2018 and operations start in 2019.

- Type: Contract
- Announced: 2017-12-05
- Where: Pengerang, Malaysia
- Status: under construction
- Products: process analyzers, analyzer houses, sampling devices, tank quality estimator
- Sectors: [Automation and Robotics](https://endata.com/sectors/automation-robotics.md)

## Companies

- [Yokogawa Kontrol (Malaysia)](https://endata.com/companies/1435.md)
- [Petronas](https://endata.com/companies/1231.md) (customer)
- [Yokogawa Electric Corporation](https://endata.com/companies/1434.md) (supplier)

## Sources

- [euro-petrole.com](https://www.euro-petrole.com/yokogawa-wins-order-to-supply-analyzer-house-for-malaysia-s-rapid-project-n-i-14825), 2017-12-05: "Further to the success, PETRONAS recognized Yokogawa's capabilities and awarded an EPCC package to supply one analyzer house with process analyzers and sampling devices"

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
