# SEW Eurodrive expands assembly plant and distribution center in Lyman, South Carolina

SEW Eurodrive awarded THS Constructors the expansion of its assembly plant and distribution center in Lyman, South Carolina, adding 75,000 square feet of assembly and warehouse space and an assembly dock expansion.

- Type: Expansion
- Announced: 2017-09-06
- Where: Lyman, South Carolina, United States
- Status: under construction
- Capacity: 75,000 square feet
- Products: hydraulic drives for industrial equipment
- Sectors: [Industrial Machinery](https://endata.com/sectors/industrial-machinery.md)

## Companies

- [Sew-Eurodrive](https://endata.com/companies/5718.md)

## Sources

- [thsconstructors.com](https://www.thsconstructors.com/sew-eurodrive/), 2017-09-06: "SEW Eurodrive builds hydraulic drives for industrial equipment distributed worldwide."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
