# DUO Manufacturing supplies rail unloading plant for Tarmac at Paddington

DUO Manufacturing was awarded a contract by Tarmac to supply a Rail Unloading and Stockpiling Plant for Tarmac's concrete plant at Crossrail's Paddington New Yard site in London, valued at £13 million.

- Type: Contract
- Announced: 2017-02-10
- Where: Paddington, London, United Kingdom
- Value: $16.3M (13.0M GBP)
- Status: completed
- Capacity: 1200 tonnes per hour
- Products: rail unloading plant, stockpiling plant, concrete
- Sectors: [Construction Materials](https://endata.com/sectors/construction-materials.md)

## Companies

- [DUO Manufacturing](https://endata.com/companies/16747.md)
- [Tarmac](https://endata.com/companies/16748.md) (customer)

## Sources

- [aggbusiness.com](https://www.aggbusiness.com/duo-manufacturing-install-rail-unloading-stockpiling-plant-at-paddington-new-yard/), 2017-02-10: "DUO Manufacturing was awarded the contract to supply a Rail Unloading (BDU) and Stockpiling Plant to support the new concrete plant."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
