# Danish Power plans Rs 200 crore transformer plant in Jaipur

Danish Power plans a Rs 200 crore greenfield transformer project at Mahindra World City in Jaipur, Rajasthan, to increase capacity from about 11,000 MVA to about 26,000 MVA from FY28 onwards, with manufacturing capability up to 400 kV class.

- Type: Expansion
- Announced: 2026-11-05
- Where: Jaipur, Rajasthan, India
- Value: $24.0M (2.00B INR)
- Starts operating: 2028
- Status: announced
- Capacity: 12,000 to 15,000 MVA
- Products: power transformers
- Sectors: [Electrical Equipment](https://endata.com/sectors/electrical-equipment.md)

## Companies

- [Danish Power](https://endata.com/companies/16226.md)

## Sources

- [multibagg.ai](https://www.multibagg.ai/market-pulse/articles/danish-power-greenfield-transformer-expansion-ppt-cmw43oqdy000n2pp1zu287epj), 2026-11-05: "Danish Power plans a Rs 200 crore greenfield transformer project in Jaipur that would increase capacity from about 11,000 megavolt-amperes (MVA) to about 26,000 MVA from FY28 onwards and add planned power-transformer manufacturing up to the 400 kilovolt (kV) class."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
