# Samsung Austin Semiconductor's Taylor fab on track for 2026

Samsung Austin Semiconductor's Fab 1 at its Taylor, Texas campus, with an initial minimum investment of $17 billion, is on track to be operational by the end of 2026. The 1,200-acre campus includes a six-floor office building and cleanroom the size of six football fields.

- Type: New facility
- Announced: 2026-11-03
- Where: Taylor, Texas, United States
- Value: $17.0B
- Status: under construction
- Products: semiconductor chips
- Sectors: [Semiconductors and Industrial Electronics](https://endata.com/sectors/semiconductors-electronics.md)

## Companies

- [Samsung Austin Semiconductor](https://endata.com/companies/15310.md)

## Sources

- [semiconductor.samsung.com](https://semiconductor.samsung.com/sas/local-news/building-a-community-inside-samsungs-taylor-campus/), 2026-11-03: "With an initial minimum investment of $17 billion, Fab 1 is on track to be operational by the end of 2026."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
