# GE Vernova adding assembly line at Greenville gas turbine plant

GE Vernova is adding equipment including a new assembly line at its gas-turbine production facility in Greenville, South Carolina, with completion expected before end of 2026.

- Type: Expansion
- Announced: 2026-11-04
- Where: Greenville, South Carolina, United States
- Status: under construction
- Products: gas turbines
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [GE Vernova](https://endata.com/companies/2947.md)

## Sources

- [industrialinfo.com](https://www.industrialinfo.com/iirenergy/industry-news/article/ge-vernova-touts-strong-if-slower-gas-turbine-orders--364506), 2026-11-03: "GE Vernova is at work on two projects to develop gas-turbine production facilities: a series of equipment additions at a plant in Greenville, South Carolina, which includes a new assembly line."
- [industrialinfo.com](https://www.industrialinfo.com/news/article/ge-vernova-touts-strong-if-slower-gas-turbine-orders--364506), 2026-11-03: "GE Vernova is at work on two projects to develop gas-turbine production facilities: a series of equipment additions at a plant in Greenville, South Carolina, which includes a new assembly line."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
