# Nikkiso to supply 16 submerged motor pumps for German LNG terminal in Brunsbüttel

Nikkiso CE&IG won a contract to supply 16 submerged motor pumps for the German LNG Terminal in Brunsbüttel, awarded by EPC contractor CS Gas North SL. The terminal is scheduled to become operational in 2027.

- Type: Contract
- Announced: 2026-09-02
- Where: Brunsbüttel, Germany
- Status: announced
- Capacity: two LNG storage tanks of 165,000 cubic metres each; 10 billion cubic metres of gas annually
- Products: submerged motor pumps, high-pressure pumps, low-pressure pumps, ship-loading pumps
- Sectors: [Pumps and Valves](https://endata.com/sectors/pumps-valves.md)

## Companies

- [Nikkiso Clean Energy & Industrial Gases Group](https://endata.com/companies/10209.md) (supplier)
- [German LNG Terminal](https://endata.com/companies/12508.md) (investor)
- [CS Gas North SL](https://endata.com/companies/14622.md) (customer)

## Sources

- [worldpumps.com](https://www.worldpumps.com/content/news/nikkiso-to-provide-16-pumps-for-german-lng-import-terminal), 2026-09-02: "Nikkiso CE&IG has secured a contract to supply 16 submerged motor pumps for the German LNG Terminal in Brunsbüttel."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
