# Bohai Kamelong wins high-pressure air valve tender for Huaneng Jintan compressed air storage plant

Bohai Kamelong Fluid Control Equipment (Tianjin) won a tender for high-pressure air valves for the two 350 MW salt-cavern compressed air energy storage units at the Huaneng Jiangsu Jintan project in Changzhou, Jiangsu, with a winning amount of 12,797,708 yuan. The result was published on February 10, 2026.

- Type: Contract
- Announced: 2026-02-10
- Where: Changzhou, Jiangsu, China
- Value: $1.78M (12.8M CNY)
- Status: announced
- Capacity: 2 x 350 MW
- Products: high-pressure air valves
- Sectors: [Pumps and Valves](https://endata.com/sectors/pumps-valves.md), [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Bohai Kamelong Fluid Control Equipment (Tianjin)](https://endata.com/companies/13991.md) (supplier)
- [Huaneng Zhongyan (Changzhou) Energy Storage](https://endata.com/companies/13992.md) (customer)

## Sources

- [dlnyzb.com](https://www.dlnyzb.com/detail/28956387), 2026-02-10: "高压空气阀门采购项目中标结果公示"

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
