# Westport starts production at expanded Cambridge, Ontario high-pressure controls facility

Westport Fuel Systems started production at its expanded product development and manufacturing facility in Cambridge, Ontario, producing GFI high-pressure fuel system components. Initial products shipped in December 2025 and capacity is ramping through Q1 2026.

- Type: Expansion
- Announced: 2026-01-19
- Where: Cambridge, Ontario, Canada
- Status: completed
- Products: GFI hydrogen fuel system components, regulators, valves, pressure relief devices
- Sectors: [Automotive Components](https://endata.com/sectors/automotive-components.md)

## Companies

- [Westport Fuel Systems](https://endata.com/companies/7017.md)

## Sources

- [insideottawavalley.com](https://www.insideottawavalley.com/globenewswire/westport-announces-start-of-production-at-two-key-high-pressure-controls-and-systems-facilities/article_ce3c206f-1183-59e2-bfba-9c748029b787.html), 2026-01-19: "Initial products were shipped to customers in December 2025, with both facilities continuing to ramp up capacity through the first quarter of 2026."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
