# Quiri completes 1,500 m2 extension of Duttlenheim plant in France

Quiri completed a 1,500 m2 extension of its Duttlenheim site in Bas-Rhin, France, costing 1.5 million euros and adding 25% production capacity. The extension was commissioned in November 2025.

- Type: Expansion
- Announced: 2025-12-12
- Where: Duttlenheim, Bas-Rhin, France
- Value: $1.77M (1.50M EUR)
- Status: completed
- Capacity: +25% production capacity
- Products: hydraulic cylinders, shock absorbers, heat exchangers
- Sectors: [Industrial Machinery](https://endata.com/sectors/industrial-machinery.md)

## Companies

- [Quiri](https://endata.com/companies/13796.md)

## Sources

- [lejournaldesentreprises.com](https://www.lejournaldesentreprises.com/article/quiri-etend-son-site-de-duttlenheim-pour-accompagner-une-montee-en-puissance-industrielle-2132983), 2025-12-12: "Les travaux, démarrés en février 2025, représentent 1 500 m² couverts supplémentaires et un investissement total de 1,5 million d'euros."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
