# Baker Hughes to supply liquefaction equipment for Sempra's Port Arthur LNG Phase 2

Baker Hughes won an award from Bechtel Energy to supply four Frame 7 gas turbines, eight centrifugal compressors and two motor-driven booster compressors for two LNG trains at Sempra Infrastructure's Port Arthur LNG Phase 2 in Jefferson County, Texas. The nameplate capacity is about 13 MTPA.

- Type: Contract
- Announced: 2025-10-01
- Where: Jefferson County, Texas, United States
- Status: announced
- Capacity: approximately 13 million tonnes per annum (MTPA)
- Products: Frame 7 gas turbines, centrifugal compressors, motor-driven compressors
- Sectors: [Industrial Machinery](https://endata.com/sectors/industrial-machinery.md)

## Companies

- [Baker Hughes](https://endata.com/companies/1895.md) (supplier)
- [Sempra Infrastructure](https://endata.com/companies/10391.md) (partner)
- [Bechtel Energy](https://endata.com/companies/10757.md) (customer)

## Sources

- [business.woonsocketcall.com](https://business.woonsocketcall.com/observerreporter/article/gnwcq-2025-10-1-baker-hughes-to-supply-liquefaction-train-equipment-for-sempra-infrastructures-port-arthur-lng-phase-2-project), 2025-10-01: "Baker Hughes announced Wednesday an award from engineering company Bechtel Energy Inc. to supply key liquefaction equipment"

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
