# Baker Hughes to supply gas turbines and compressors for Rio Grande LNG Train 4

Baker Hughes won an award from Bechtel Energy to supply main liquefaction equipment, including two Frame 7 gas turbines and six centrifugal compressors, for Train 4 of NextDecade's Rio Grande LNG facility in Brownsville, Texas. The order adds about 6 MTPA of LNG capacity.

- Type: Contract
- Announced: 2025-09-11
- Where: Port of Brownsville, Texas, United States
- Status: announced
- Capacity: approximately 6 MTPA additional LNG capacity
- Products: gas turbines, centrifugal compressors, liquefaction equipment
- Sectors: [Industrial Machinery](https://endata.com/sectors/industrial-machinery.md), [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Baker Hughes](https://endata.com/companies/1895.md) (supplier)
- [NextDecade](https://endata.com/companies/2962.md) (investor)
- [Bechtel Energy](https://endata.com/companies/10757.md) (customer)

## Sources

- [nasdaq.com](https://www.nasdaq.com/press-release/baker-hughes-secures-order-rio-grande-lng-expansion-2025-09-11), 2025-09-11: "Replicating the technology solutions provided for the first three LNG trains, the Train 4 order includes two Frame 7 gas turbines, known for their proven reliability and energy efficiency, and six centrifugal compressors."
- [business.woonsocketcall.com](https://business.woonsocketcall.com/observerreporter/article/gnwcq-2025-9-11-baker-hughes-secures-order-for-rio-grande-lng-expansion), 2025-09-11: "Replicating the technology solutions provided for the first three LNG trains, the Train 4 order includes two Frame 7 gas turbines, known for their proven reliability and energy efficiency, and six centrifugal compressors."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
