# Bürkert opens 6,000 m² production building and AKL warehouse in Öhringen

Bürkert Fluid Control Systems officially commissioned a new 6,000 square metre building with an automated small-parts warehouse in Öhringen, part of a 20 million euro investment. The buildings have been ready for use since June 2024.

- Type: Expansion
- Announced: 2024-06-01
- Where: Öhringen, Germany
- Value: $21.7M (20.0M EUR)
- Status: completed
- Capacity: 6,000 m² building
- Products: process and control valves
- Sectors: [Pumps and Valves](https://endata.com/sectors/pumps-valves.md), [Material Handling](https://endata.com/sectors/material-handling.md)

## Companies

- [Bürkert Fluid Control Systems](https://endata.com/companies/4272.md)

## Sources

- [industry-press.com](https://industry-press.com/buerkert-fluid-control-systems-staerkt-standort-hohenlohe/), 2025-08-01: "Die Investitionssumme in Höhe von 20 Millionen Euro stellt einen Impuls für modernste Technik sowie ergonomische Arbeitsbedingungen dar"

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
