# Baker Hughes to supply CO2 compressors for Eni's Liverpool Bay CCS project

Baker Hughes has been awarded a contract by Saipem to supply three CO2 centrifugal compressor trains with electric motors and gearboxes for Eni's Liverpool Bay carbon capture and storage project in the UK.

- Type: Contract
- Announced: 2025-07-03
- Where: Point of Ayr, north Wales, United Kingdom
- Status: announced
- Products: CO2 centrifugal compressors, electric motors, gearboxes
- Sectors: [Industrial Machinery](https://endata.com/sectors/industrial-machinery.md)

## Companies

- [Eni](https://endata.com/companies/1667.md) (customer)
- [Saipem](https://endata.com/companies/1847.md) (customer)
- [Baker Hughes](https://endata.com/companies/1895.md) (supplier)

## Sources

- [offshore-mag.com](https://www.offshore-mag.com/equipment-engineering/news/55301122/baker-hughes-baker-hughes-supplying-compressors-motors-for-liverpool-bay-co2-injection), 2025-07-03: "Baker Hughes will supply three advanced CO 2 centrifugal compressor trains with electric motors and Lufkin Gears gearbox."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
