# GE Power India wins Rs 2.73 billion E&M contract for Saundatti hydro project

GE Power India Limited won a Rs 2.73 billion contract from Greenko KA01 IREP for the electro-mechanical package of an additional 320 MW unit in the Saundatti pumped storage project in Karnataka. The work is scheduled for completion by November 2027.

- Type: Contract
- Announced: 2025-03-04
- Where: Belagavi district, Karnataka, India
- Value: $32.0M (2.73B INR)
- Status: completed
- Capacity: 320 MW unit
- Products: electro-mechanical equipment, hydro turbines, pump turbine systems
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [GE Power India](https://endata.com/companies/3202.md)
- [GREENKO KA01 IREP](https://endata.com/companies/12827.md) (customer)

## Sources

- [powerpeakdigest.com](https://powerpeakdigest.com/ge-power-secures-em-contract-for-saundatti-hydro-project/), 2025-03-04: "GE Power India Limited has won a Rs 2.73 billion contract from Greenko KA01 IREP Private Limited for the electro-mechanical (E&M) package of an additional 320 MW unit"
- [renewablewatch.in](https://renewablewatch.in/2025/03/05/ge-power-india-secures-rs-2-7-billion-contract-from-greenko/), 2025-03-05: "GE Power India Limited has received an order worth Rs 2.7 billion from Greenko KA01 IREP for the engineering, manufacturing, procurement, supply, installation, and testing of electromechanical equipment"

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
