# Tsea to build $900M transformer complex in Contagem, Brazil

Tsea has taken possession of a site in Contagem, Brazil, for a R$900 million complex to produce power transformers. The facility is expected to begin operations in 2030.

- Type: New facility
- Announced: 2026-11-09
- Where: Contagem, Minas Gerais, Brazil
- Value: $162.0M (900.0M BRL)
- Starts operating: 2030
- Status: announced
- Products: power transformers
- Sectors: [Electrical Equipment](https://endata.com/sectors/electrical-equipment.md)

## Companies

- [TSEA](https://endata.com/companies/16083.md)

## Sources

- [diariodocomercio.com.br](https://diariodocomercio.com.br/economia/tsea-complexo-industrial-contagem/), 2026-11-09: "A Tsea deu mais um passo para viabilizar a construção do maior complexo industrial de transformadores de potência das Américas."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
