# Torus boosts output 76% at Salt Lake City GigaOne factory

Torus reported a 76% company-wide production increase since bringing its 545,000 sq ft GigaOne factory in Salt Lake City online about six months ago. The plant builds hybrid flywheel and battery energy storage systems.

- Type: Expansion
- Announced: 2026-11-06
- Where: Salt Lake City, Utah, United States
- Starts operating: May 2026
- Status: completed
- Capacity: 1 GW nameplate capacity annually
- Products: hybrid flywheel and lithium iron phosphate battery systems, HVAC equipment, power-cap assemblies
- Sectors: [Electrical Equipment](https://endata.com/sectors/electrical-equipment.md)

## Companies

- [Torus](https://endata.com/companies/95255.md)

## Sources

- [wisevoter.com](https://wisevoter.com/world/us/ut/salt-lake-city/2026/11/06/torus-gigaone-factory-production-salt-lake-city), 2026-11-06: "Torus says its GigaOne factory in Salt Lake City has lifted company-wide production by more than 76% since opening about six months ago."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
