# Keda Manufacturing to build $113M float glass plant in Kenya

Keda Manufacturing (Keda Industrial Group) announced a $112.7 million investment to build a 600-tonne-per-day float glass production line in Kenya. Construction is expected to start in December 2026 and take 19-20 months.

- Type: New facility
- Announced: 2026-10-29
- Where: Kenya, Kenya
- Value: $112.7M
- Starts operating: Jun 2028
- Status: announced
- Capacity: 600 tonnes per day
- Products: float glass (3-12mm white and colored glass)
- Sectors: [Construction Materials](https://endata.com/sectors/construction-materials.md)

## Companies

- [Keda Industrial Group](https://endata.com/companies/48696.md)

## Sources

- [finance.sina.cn](https://finance.sina.cn/2026-10-29/detail-iniwvftn3144772.d.html?oid=%E6%97%A7%E9%87%91%E5%B1%B1%E6%B9%BE%E5%8C%BA%E5%A4%96%E5%9B%B4%E7%BE%8E%E5%A5%B3%E6%9C%8D%E5%8A%A1%EF%BC%88%E9%AA%8C%E8%AF%81%E4%BF%9D%E7%9C%9F%EF%BC%89%EF%BC%88%E8%81%94%E7%BB%9CV%E5%8A%A0%EF%BC%9A%E2%91%A0%E2%91%A0778593%EF%BC%89%E8%A7%81%E9%9D%A2%E4%BB%98%E6%AC%BE%E7%9C%9F%E4%BA%BA%E9%AA%8C%E8%AF%81%E5%AF%B9%E6%AF%94%E6%97%A0%E5%A5%97%E8%B7%AFB5zfWreu7GAJMvHaD0214&vt=4), 2026-10-29: "本次投资是科达制造践行以瓷砖、玻璃及洁具为核心的“大建材”战略的重要落地举措"

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
