# Nativo Resources awards engineering contract for La Patona gold plant to StratumX

Nativo Resources Plc has awarded the detailed design and construction engineering contract for its La Patona Gold Ore Processing Plant in Peru to StratumX, working with its in-house team, marking the transition to the EPC stage.

- Type: Contract
- Announced: 2026-10-26
- Where: La Patona, Peru, Peru
- Status: announced
- Capacity: 70 tonnes per day (initial), scalable to 350 tonnes per day
- Products: gold ore processing plant
- Sectors: [Mining Equipment](https://endata.com/sectors/mining-equipment.md)

## Companies

- [Nativo Resources](https://endata.com/companies/94724.md) (customer)
- [StratumX](https://endata.com/companies/94725.md) (supplier)

## Sources

- [investegate.co.uk](https://www.investegate.co.uk/index.php/announcement/rns/nativo-resources--ntvo/design-and-construction-engineering-contract/9840047), 2026-10-26: "Nativo Resources Plc has awarded the contract for the detailed design and construction engineering of the La Patona Gold Ore Processing Plant to Stratumx CC S.A.C., working alongside Nativo's in-house engineering team."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
