# GE Vernova to supply gas turbine for 372 MW Songon power plant in Côte d'Ivoire

GE Vernova announced it will provide a 9E gas turbine and generator for the new Songon combined-cycle power plant near Abidjan, Côte d'Ivoire, developed by Songon Energies. The 372 MW plant is expected to create up to 1,400 jobs and begin operations in 2029.

- Type: Contract
- Announced: 2026-10-20
- Where: Songon, near Abidjan, Côte d'Ivoire, Côte d’Ivoire
- Jobs: 1,400
- Status: announced
- Capacity: 372 MW
- Products: gas turbine, generator
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [GE Vernova](https://endata.com/companies/2947.md) (supplier)
- [Songon Energies](https://endata.com/companies/94658.md) (customer)
- [China Energy International Engineering](https://endata.com/companies/94659.md) (partner)

## Sources

- [gevernova.com](https://www.gevernova.com/news/press-releases/ge-vernova-secures-order-aimed-strengthen-regional-energy-capacity-cote-divoire), 2026-10-20: "GE Vernova announced today that it will provide the gas power technology for the new Songon combined-cycle power plant, located in the Songon region near Abidjan, Côte d’Ivoire."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
