# FILTEC to upgrade Bendigo Recycled Water Factory for Coliban Water

FILTEC has been engaged as lead contractor by Coliban Water to deliver a major upgrade to the Bendigo Recycled Water Factory, increasing Class A recycled water production from approximately 3 ML per day to 10 ML per day. The project includes integrating a new ultrafiltration membrane system.

- Type: Expansion
- Announced: 2026-10-05
- Where: Bendigo, Australia
- Status: under construction
- Capacity: increase from 3 ML/day to 10 ML/day of Class A recycled water
- Products: recycled water, ultrafiltration membrane system
- Sectors: [Water Treatment Equipment](https://endata.com/sectors/water-treatment-equipment.md)

## Companies

- [Filtec](https://endata.com/companies/37953.md)
- [Coliban Water](https://endata.com/companies/85175.md) (customer)

## Sources

- [waterdirectory.org.nz](https://www.waterdirectory.org.nz/blog-articles/filtec-to-deliver-major-upgrade-for-bendigo-recycled-water-factory/other), 2026-10-05: "FILTEC has been engaged as lead contractor by Coliban Water to deliver a major upgrade to the Bendigo Recycled Water Factory."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
