# LinkSolution signs $1M contract with Hanwha Aerospace for additive manufacturing

LinkSolution signed a 1.4331 billion won ($1.07 million) contract with Hanwha Aerospace for development and verification of additive manufacturing process parameters for lunar lander engines and thrusters. The contract runs from September 29 to December 31, 2026.

- Type: Contract
- Announced: 2026-09-30
- Where: South Korea
- Value: $1.07M (1.43B KRW)
- Status: completed
- Products: additive manufacturing process parameters for lunar lander engines and thrusters
- Sectors: [Aerospace Components](https://endata.com/sectors/aerospace-components.md)

## Companies

- [Hanwha Aerospace](https://endata.com/companies/5761.md) (customer)
- [LinkSolution](https://endata.com/companies/94376.md) (supplier)

## Sources

- [cbcglobe.com](https://cbcglobe.com/en/articles/2026/09/30/breaking-linksolution-signs-1-4331-billion-won-supply-contra-5817f6db), 2026-09-30: "LinkSolution announced in a regulatory filing on the 30th that it has signed a single sales and supply contract worth 1.4331 billion won with Hanwha Aerospace."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
