# CG Power starts production at $83.8M transformer plant in Sehore, India

CG Power and Industrial Solutions rolled out the first power transformer from its new $83.8 million greenfield facility in Sehore, Madhya Pradesh. The plant has an initial capacity of 10,000 MVA, with planned expansion to 45,000 MVA, and is expected to generate over 2,000 jobs.

- Type: New facility
- Announced: 2026-09-07
- Where: Sehore, Madhya Pradesh, India, India
- Value: $83.8M
- Jobs: 2,000
- Starts operating: 4 Sep 2026
- Status: completed
- Capacity: 10,000 MVA (initial), 45,000 MVA (planned full)
- Products: power transformers (220 kV to 1200 kV)
- Sectors: [Electrical Equipment](https://endata.com/sectors/electrical-equipment.md)

## Companies

- [CG Power and Industrial Solutions](https://endata.com/companies/16858.md)

## Sources

- [transformer-magazine.com](https://transformer-magazine.com/news/cg-power-starts-83-8-m-transformer-plant/), 2026-09-07: "The first transformer was completed on 4 September 2026."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
