# Coop expands automated warehouse at Langhus with 50,000 pallet positions

Coop Faghandel is expanding its automated distribution centre at Langhus, Norway, adding approximately 50,000 automated pallet positions, new stacker cranes, inbound automation, and a 400-metre conveyor. Swisslog will deliver the project. Construction begins in 2026, with completion planned for early 2028.

- Type: Expansion
- Announced: 2026-09-03
- Where: Langhus, south of Oslo, Norway
- Starts operating: 2028
- Status: announced
- Capacity: approximately 50,000 automated pallet positions
- Products: automated pallet storage, stacker cranes, conveyor systems
- Sectors: [Material Handling](https://endata.com/sectors/material-handling.md)

## Companies

- [Coop Norge](https://endata.com/companies/93826.md)
- [Swisslog](https://endata.com/companies/6942.md) (supplier)

## Sources

- [in-supply.co.uk](https://in-supply.co.uk/coop-expands-automated-capacity-at-langhus-warehouse/), 2026-09-03: "Coop Faghandel is expanding its automated distribution centre at Langhus, south of Oslo, with a high-bay pallet warehouse that will take the operation beyond 100,000 automated pallet positions"

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
