# Bosch expands Reutlingen wafer fab cleanroom by 5,000 sq m

Bosch expanded cleanroom space at its Reutlingen wafer fab by more than 5,000 square meters by end of 2025, and transitioned SiC production to the latest wafer generation. The company plans to invest €650 million in Reutlingen between 2026 and 2029.

- Type: Expansion
- Announced: 2025-12-31
- Where: Reutlingen, Germany, Germany
- Value: $700.0M (650.0M EUR)
- Starts operating: 2025
- Status: completed
- Capacity: 5,000 square meters cleanroom space
- Products: silicon carbide semiconductors
- Sectors: [Semiconductors and Industrial Electronics](https://endata.com/sectors/semiconductors-electronics.md)

## Companies

- [Bosch](https://endata.com/companies/1725.md)

## Sources

- [bosch-semiconductors.com](https://www.bosch-semiconductors.com/stories-and-events/two-fabs-one-goal-reliable-sic-supply/), 2026-07-13: "By the end of 2025, the cleanroom space at the Reutlingen wafer fab had been expanded by more than 5,000 square meters to meet growing demand."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
