# Georg Schlegel expands Dürmentingen plant with new building

Georg Schlegel started construction of a major plant expansion at its headquarters in Dürmentingen, adding 2,800 square meters of production and office space, increasing total area to about 8,500 square meters.

- Type: Expansion
- Announced: 2026-06-19
- Where: Dürmentingen, Germany
- Status: under construction
- Capacity: 2,800 sqm additional floor space
- Products: command devices, signal lamps, RFID components, bus interfaces, IO-Link, EtherCAT
- Sectors: [Automation and Robotics](https://endata.com/sectors/automation-robotics.md), [Electrical Equipment](https://endata.com/sectors/electrical-equipment.md)

## Companies

- [Georg Schlegel](https://endata.com/companies/92542.md)

## Sources

- [elektronikpraxis.de](https://www.elektronikpraxis.de/automatisierer-georg-schlegel-baut-seinen-standort-massiv-aus-a-aa578227935e4166dec63325c7fe44ec/), 2026-06-19: "Der Neubau ist ein klares Bekenntnis zum Standort Dürmentingen sowie zur Zukunft der Produktion 'Made in Germany'."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
